- Significant cost reductions compared to conventional methods means The Client is able to successfully remediate more abandoned well and pipeline sites in far less time.
- Wrango’s ongoing research and development provides continuous process improvements with the opportunity to achieve greater project cost effectiveness.
- With a focus on increased efficiencies, Wrango speeds oilfield project completions, reduces required job time significantly, all but eliminates the environmental footprint and provides significant cost advantages
Wrango’s methods for well and pipeline abandonment is a significant leap forward for the oil and gas industry eclipsing both the conventional and methods.
Wrango’s methodologies and technologies, have the capacity to save our Clients time and resources on their P&A and asset retirement programs by reducing the following:
- Ground Disturbance Procedures, by mitigating risk to other underground equipment.
- Reduce the requirement of hydrovac, excavator, mobilization/demobilization, welder, etc.
- Restoration Area to be restored will be not much bigger than size of pipeline and will grow over.
- Multiple cuts in an area can be done in one day limiting supervision and travel costs.